sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Locations
Gallery
FAQs
Policies
Reasonable Adjustments and special considerations
GENERAL DATA PROTECTION REGULATION (GDPR)
ROLES & RESPONSIBILITIES FOR VOCATIONAL QUALIFICATIONS
Malpractice and Maladministration Policy
EQUAL OPPORTUNITIES POLICY
Data Protection Policy
DATA MANAGEMENT PROCEDURE FOR SQA QUALIFICATIONS
COMPLAINTS POLICY
APPEALS POLICY & PROCEDURE
Recognition of Prior Learning Policy
Health and Safety Policy
Fair Work First Policy
Safeguarding Policy
Use of AI in Assessment Work Policy
Website Privacy Policy
Resources
Reviews
Associates
Log In
Funded Qualifications
yes
Road Building – Observation Report – Route 17 Units
Road Building – Observation Report – Route 17 Units
Flexible Paving (Machine)
Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials
Candidate First Name
Candidate Last Name
Date
Location
Address Line 1
Address Line 2
City
County
Post Code
Unit Covered
– Select –
HM5M – Paver
HM5T – Spray Tanker
HM5K – Paver Screwman
HM5E – 180 Excavator
HM5N – Roller
HM5F – Chipping Machine
HM5J – Loader Compressor
HM5G – Geosynthetic Installation Equipment
HM5R – Spray Injection
HL7R and HL7T
Observation
P1 – Interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers’ information related to the plant, machinery or equipment operations and the work to be carried out.
P2 – Organise own work and communicate with team members and other associated occupations about the plant, machinery or equipment operations and the work to be carried out.
P6 – Protect work area and surroundings from damage, Maintain a clean work area and dispose of waste accordance with current legislation.
P7 (10) – Demonstration of work skills to check, set up, adjust, communicate, operate, control, secure, lay, compact, mark, level and finish.
P7 (11) – Use and maintain hand tools, ancillary equipment and/or accessories.
P7 (12.1) – Paver screwman (screed operator) maintaining line and level
P7 (12.2) – Paver (tracked or wheeled) operator maintaining consistency of surface materials, line and direction
P7 (12.3) – Roller operator ensuring compaction, transverse and longitudinal evenness
P7 (12.4) – Chipping machine operator maintaining speed and distribution
P7 (12.5) – Loader compressor or 180 degree excavator operator maintaining supply of materials and/or preparing surfaces
P7 (12.6) – Spray tanker operator maintaining speed, line, direction and distribution
P7 (12.7) – Geosynthetic (membrane or steel mesh) installation equipment operator maintaining uniformity, line, direction, overlap and adhesion
P7 (12.8) – Spray injection operator ensuring compaction and finish
P7 (13) – Shut down and secure plant, machinery or equipment
Any further Observation report relating to optional unit
Supporting Picture 1
Choose File
Supporting Picture 1 – Description
Supporting Picture 2
Choose File
Supporting Picture 2 – Description
Supporting Picture 3
Choose File
Supporting Picture 3 – Description
Supporting Picture 4
Choose File
Supporting Picture 4 – Description
Supporting Picture 5
Choose File
Supporting Picture 5 – Description
Supporting Picture 6
Choose File
Supporting Picture 6 – Description
Supporting Picture 7
Choose File
Supporting Picture 7 – Description
Supporting Picture 8
Choose File
Supporting Picture 8 – Description
Supporting Picture 9
Choose File
Supporting Picture 9 – Description
Supporting Picture 10
Choose File
Supporting Picture 10 – Description
Supporting Picture 11
Choose File
Supporting Picture 11 – Description
Supporting Picture 12
Choose File
Supporting Picture 12 – Description
Supporting Picture 13
Choose File
Supporting Picture 13 – Description
Supporting Picture 14
Choose File
Supporting Picture 14 – Description
Supporting Picture 15
Choose File
Supporting Picture 15 – Description
Supporting Picture 16
Choose File
Supporting Picture 16 – Description
Supporting Picture 17
Choose File
Supporting Picture 17 – Description
Supporting Picture 18
Choose File
Supporting Picture 18 – Description
Supporting Picture 19
Choose File
Supporting Picture 19 – Description
Supporting Picture 20
Choose File
Supporting Picture 20 – Description
Assessor First Name
Assessor Last Name
Assessor Signature
Sign Here
Assessor Signature
Choose File
Submit Form