sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Gallery
FAQs: General
Policies
Resources
Reviews
Associates
Funded Qualifications
Contact Us
Locations
Enquiry Form
Log In
yes
Site Supervisor Observation Report – Highways
Site Supervisor – Observation Report – Highways
Candidate First Name
Candidate Last Name
Date
Location
Address Line 1
Address Line 2
City
County
Post Code
Mandatory unit 1
Mandatory unit 2
Mandatory unit 3
Mandatory unit 4
Mandatory unit 5
Mandatory unit 6
Mandatory unit 7
Mandatory unit 8
Mandatory unit 9
Mandatory unit 10
Mandatory unit 11
Mandatory unit 12
Mandatory unit 13
Mandatory unit 14
Optional unit 1
OBSERVATION
F3H0 (P4.5) – Engage regular discussions with relevant people about the occupational work activity and/or other occupations involved.
F3H0 (K7) – Clarify alternative proposals with relevant people.
F3H0 (K8) – Suggest alternative proposals
J5YH (P3) – Identify and implement improvements to health, safety, welfare, wellbeing and the environment on site
J5YH (P10) – Identify, record and report any site conditions which do not comply with organisational requirements.
J5YT (P1) – supervise the storage and use of at least one of the following materials and components so that material handling and movement is recorded, efficient and wastage is minimised: 1.1 raw materials 1.2 manufactured materials 1.3 components 1.4 prefabricated systems
J5YT (K1) – how to supervise storage areas or facilities for supplies of the following materials and components so that they are effective for the project: K1.1 raw materials K1.2 manufactured materials K1.3 components K1.4 prefabricated systems
J5YT (K2) – how to minimise material and component handling, movement and wastage
J5YT (P2) – calculate and keep accurate records of deliveries and stock position, using at least one the following, and pass the information to decision-makers: 2.1 manual 2.2 electronic
J5YT (K3, K4 + K5) – different methods and techniques for calculating and keeping accurate manual and electronic records of deliveries and stock position.
J5YT (P4) – check stock records regularly and calculate what replacement stock will be needed and record the outcomes
J5YT (K9) – how to calculate the following stock turnover processes for a project: K9.1 usage rates K9.2 initial impressed K9.3 just-in-time systems K9.4 call or draw-down systems
J5YT (K10) – how to check stock records to calculate replacement stock
J604 + J605 (P1) – supervise, confirm and record at least two programmed maintenance activities and five repair activities on controlled roads which will minimise disruption and maintain optimum performance using the following: Maintenance activities: 1.1 scheduled and preventative 1.2 corrective 1.3 emergency Repair activities: 1.4 structure 1.5 surface 1.6 damaged materials 1.7 markings 1.8 fittings 1.9 power and light 1.10 drainage 1.11 telecommunications 1.12 special services and equipment; 1.13 landscaping 1.14 temporary traffic management 1.15 fencing 1.16 vehicle restraint systems including noise reducing devises 1.17 signs 1.18 lighting columns and traffic control equipment
J604 (P5) – P5 amend priorities to take account of the following changing circumstances whilst maintaining consistency with the influencing factors: 5.1 susceptibility to damage 5.2 safety requirements 5.3 need to inhibit and respond to deterioration 5.4 compromised operational effectiveness 5.5 weather conditions 5.6 use or change of use 5.7 current legislation 5.8 resources 5.9 security threats
J604 (P3) – Consult at least two of the following guidance materials and record the outcomes: – manufacturer’s instructions under the Construction Product Regulations – log books – maintenance schedules and manuals – practice guides and specifications – current legislation and official guidance.
Any further Observations
Supporting Picture 1
Choose File
Supporting Picture 1 – Description
Supporting Picture 2
Choose File
Supporting Picture 2 – Description
Supporting Picture 3
Choose File
Supporting Picture 3 – Description
Supporting Picture 4
Choose File
Supporting Picture 4 – Description
Supporting Picture 5
Choose File
Supporting Picture 5 – Description
Supporting Picture 6
Choose File
Supporting Picture 6 – Description
Supporting Picture 7
Choose File
Supporting Picture 7 – Description
Supporting Picture 8
Choose File
Supporting Picture 8 – Description
Supporting Picture 9
Choose File
Supporting Picture 9 – Description
Supporting Picture 10
Choose File
Supporting Picture 10 – Description
Supporting Picture 11
Choose File
Supporting Picture 11 – Description
Supporting Picture 12
Choose File
Supporting Picture 12 – Description
Supporting Picture 13
Choose File
Supporting Picture 13 – Description
Supporting Picture 14
Choose File
Supporting Picture 14 – Description
Supporting Picture 15
Choose File
Supporting Picture 15 – Description
Supporting Picture 16
Choose File
Supporting Picture 16 – Description
Supporting Picture 17
Choose File
Supporting Picture 17 – Description
Supporting Picture 18
Choose File
Supporting Picture 18 – Description
Supporting Picture 19
Choose File
Supporting Picture 19 – Description
Supporting Picture 20
Choose File
Supporting Picture 20 – Description
Assessor First Name
Assessor Last Name
Assessor Signature
Sign Here
Assessor Signature
Choose File
Submit Form