sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Locations
Gallery
FAQs
Policies
Reasonable Adjustments and special considerations
GENERAL DATA PROTECTION REGULATION (GDPR)
ROLES & RESPONSIBILITIES FOR VOCATIONAL QUALIFICATIONS
Malpractice and Maladministration Policy
EQUAL OPPORTUNITIES POLICY
Data Protection Policy
DATA MANAGEMENT PROCEDURE FOR SQA QUALIFICATIONS
COMPLAINTS POLICY
APPEALS POLICY & PROCEDURE
Recognition of Prior Learning Policy
Health and Safety Policy
Fair Work First Policy
Safeguarding Policy
Use of AI in Assessment Work Policy
Website Privacy Policy
Resources
Reviews
Associates
Log In
Funded Qualifications
yes
Road Building – PD Sign Off – Route 17 Units
Road Building – PD Sign Off – Route 17 Units
Flexible Paving (Machine)
Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials
Candidate First Name
Candidate Last Name
Date
Unit Covered
– Select –
HM5M – Paver
HM5T – Spray Tanker
HM5K – Paver Screwman
HM5E – 180 Excavator
HM5N – Roller
HM5F – Chipping Machine
HM5J – Loader Compressor
HM5G – Geosynthetic Installation Equipment
HM5R – Spray Injection
HL7R and HL7T
Professional Discussion
P1 – Interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers’ information related to the plant, machinery or equipment operations and the work to be carried out.
Achieved
Comments
P2 – Organise own work and communicate with team members and other associated occupations about the plant, machinery or equipment operations and the work to be carried outments and manufacturers’ information related to the plant, machinery or equipment operations and the work to be carried out.
Achieved
Comments
P3 comply with the relevant, current legislation, special legal status documents, official guidance and organisational procedures to maintain safe and healthy work practices
Achieved
Comments
P4 request resources to sustain plant or machinery operations to complete the programme of work
Achieved
Comments
P5 select plant or machinery resources for the methods of work and operations to be carried out
Achieved
Comments
P6 comply with organisational procedures to minimise the risk of damage to the work and surrounding area
Achieved
Comments
P7 comply with the given contract information to carry out the work efficiently to the required specification
Achieved
Comments
P8 complete the work within the allocated time, in accordance with the programme of work
Achieved
Comments
Any further discussions
Assessor First Name
Assessor Last Name
Assessor Signature
Sign Here
Submit Form