sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Gallery
FAQs
Policies
Resources
Reviews
Associates
Open Courses
Funded Qualifications
Contact Us
Locations
Enquiry Form
Log In
yes
Road Building – Observation Report – Route 17 Units
Road Building – Observation Report – Route 17 Units
Flexible Paving (Machine)
Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials
Candidate First Name
Candidate Last Name
Date
Location
Address Line 1
Address Line 2
City
County
Post Code
Unit Covered
– Select –
HM5M – Paver
HM5T – Spray Tanker
HM5K – Paver Screwman
HM5E – 180 Excavator
HM5N – Roller
HM5F – Chipping Machine
HM5J – Loader Compressor
HM5G – Geosynthetic Installation Equipment
HM5R – Spray Injection
HL7R and HL7T
Observation
P1 – Interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers’ information related to the plant, machinery or equipment operations and the work to be carried out.
P2 – Organise own work and communicate with team members and other associated occupations about the plant, machinery or equipment operations and the work to be carried out.
P6 – Protect work area and surroundings from damage, Maintain a clean work area and dispose of waste accordance with current legislation.
P7 (10) – Demonstration of work skills to check, set up, adjust, communicate, operate, control, secure, lay, compact, mark, level and finish.
P7 (11) – Use and maintain hand tools, ancillary equipment and/or accessories.
P7 (12.1) – Paver screwman (screed operator) maintaining line and level
P7 (12.2) – Paver (tracked or wheeled) operator maintaining consistency of surface materials, line and direction
P7 (12.3) – Roller operator ensuring compaction, transverse and longitudinal evenness
P7 (12.4) – Chipping machine operator maintaining speed and distribution
P7 (12.5) – Loader compressor or 180 degree excavator operator maintaining supply of materials and/or preparing surfaces
P7 (12.6) – Spray tanker operator maintaining speed, line, direction and distribution
P7 (12.7) – Geosynthetic (membrane or steel mesh) installation equipment operator maintaining uniformity, line, direction, overlap and adhesion
P7 (12.8) – Spray injection operator ensuring compaction and finish
P7 (13) – Shut down and secure plant, machinery or equipment
Any further Observation report relating to optional unit
Supporting Picture 1
Choose File
Supporting Picture 1 – Description
Supporting Picture 2
Choose File
Supporting Picture 2 – Description
Supporting Picture 3
Choose File
Supporting Picture 3 – Description
Supporting Picture 4
Choose File
Supporting Picture 4 – Description
Supporting Picture 5
Choose File
Supporting Picture 5 – Description
Supporting Picture 6
Choose File
Supporting Picture 6 – Description
Supporting Picture 7
Choose File
Supporting Picture 7 – Description
Supporting Picture 8
Choose File
Supporting Picture 8 – Description
Supporting Picture 9
Choose File
Supporting Picture 9 – Description
Supporting Picture 10
Choose File
Supporting Picture 10 – Description
Supporting Picture 11
Choose File
Supporting Picture 11 – Description
Supporting Picture 12
Choose File
Supporting Picture 12 – Description
Supporting Picture 13
Choose File
Supporting Picture 13 – Description
Supporting Picture 14
Choose File
Supporting Picture 14 – Description
Supporting Picture 15
Choose File
Supporting Picture 15 – Description
Supporting Picture 16
Choose File
Supporting Picture 16 – Description
Supporting Picture 17
Choose File
Supporting Picture 17 – Description
Supporting Picture 18
Choose File
Supporting Picture 18 – Description
Supporting Picture 19
Choose File
Supporting Picture 19 – Description
Supporting Picture 20
Choose File
Supporting Picture 20 – Description
Assessor First Name
Assessor Last Name
Assessor Signature
Sign Here
Assessor Signature
Choose File
Save & Resume
Submit Form