sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Gallery
FAQs: General
Policies
Reasonable Adjustments and special considerations
GENERAL DATA PROTECTION REGULATION (GDPR)
ROLES & RESPONSIBILITIES FOR VOCATIONAL QUALIFICATIONS
Malpractice and Maladministration Policy
EQUAL OPPORTUNITIES POLICY
Data Protection Policy
DATA MANAGEMENT PROCEDURE FOR SQA QUALIFICATIONS
COMPLAINTS POLICY
APPEALS POLICY & PROCEDURE
Recognition of Prior Learning Policy
Health and Safety Policy
Fair Work First Policy
Safeguarding Policy
Use of AI in Assessment Work Policy
Website Privacy Policy
Resources
Reviews
Associates
Funded Qualifications
Contact Us
Locations
Enquiry Form
Log In
yes
Plant Operator Quiz
Plant Operations Quiz
First Name
Last Name
K19 Why should disposal of waste be carried out safely? (Pick the best reason)
Because I am told to
To protect the environment and people
Its makes the site look tidy
K12 How would you comply with Environmental practices and legislation?
Put all waste in one skip
Chuck waste paint tins in the skip
Segregate waste
K4. What is the incorrect way to communicate ideas?
I expect others to communicate on my behalf
At daily briefings
Via radios
Hand signals
K17 How do you minimise potential hazards with resources and methods of work?
All of these
Follow training
Follow manufacturers instructions
I will use the correct PPE and follow risk assessments and method statements
K22 Whats a works program for and why?
Program of work allows materials and equipment to be used to their best efficiency and minimises down time
All of these
A work program helps to pre-plan future work schedules/costs more accurately
Work programs help to plan and minimise work disruptions
K10. How do you report accidents on site? (Select 2)
I only report accidents if I am hospitalised
I will record any accidents in the accident report book
Phone line manager and report any accidents
I don’t need to report accidents
K14 + K15 What would you do if the plant/resources had a defect or was unsuitable?
Make the best of it, time is money
Don’t use the plant/resources, report the issues and wait until they are rectified
Carry on using it until something better was available
K18 How do you protect work from damage?
I would use control measures detailed in the risk assessment to minimise the risk of hazards
I would hope people would avoid work areas
I would try to warn people when they are too close to work areas
K5. How do you organise resources in conjunction with the progress of work
Discuss requirements with my manager in advance
Order twice as much so I don’t run out
Hire at the moment needed and hope the plant is available
Someone else should do this
K8. What should you do in an emergency?
I should follow procedures and my training
Carry on working
Ignore it, it’s probably a practice
K13 How would you request or order materials or consumables? (Select 2)
I would put items needed on my daily check sheet which gets handed in
I don’t need to request materials
I would ask my line manager or supervisor
K21 How would you maintain tools and Equipment?
Use it till it stops working
Try and work it out myself
As per workshop manual and schedules
K9. What action would NOT keep tools safe on site?
Leave tools lying around where I am working
Keep tools in a locked box when not in use
Sign in and Out all tools
K11. How would you use safety control Equipment on site?
Only a Health and Safety officer can use safety equipment
I will follow the training given
I will do what I think best without been trained
K1. What should you do if you find incorrect information and unsuitable resources?
I hope someone else reports any problems
Report to my foreman verbally and my manager by phone or at my works briefing where alternative resources are arranged
I will wait until my manager comes to site and speak to them then
I will try to use whatever resources I have been allocated
K16 + K20 How are resources and work methods chosen and why?
By organising a works program, permits to work can be arranged and resources ordered
All of these
A pre-work survey is carried out so that resources can be ordered to minimise any in-efficiency and works programmed can be planned
A work briefing is carried out so that all participants know what is expected of them and feedback can be received
K7. What level of understanding should an operative have to complete tasks given?
All of these
I need to work to Risk assessments and Method Statements
I need to know my responsibilities under HSAW 1974
I need to understand Safe Systems of Work
K6. In relation to skills needed to carry out my work, which is False
I don’t have to have any skills
I have to demonstrate through competence that I can safely carryout my tasks
I must be able to communicate with all personnel on site and fully complete all paperwork
K3. What is the procedure for solving problems when they arise?
Wait for the site manager to come to site, then report
Solve it if I have authority or check with line manager
Carry on working regardless
K2. What should you NOT do if you are unsure
Check the work specification and resources from the work instructions
Check the Method Statement I have been given
Try and work it out
Check the manufacturers guidelines
Candidate Signature
Sign Here
Submit Form