sales@fdetraining.co.uk
Tel: 01506 871375
MENU
close menu
close menu
Home
Gallery
FAQs
Policies
Resources
Reviews
Associates
Open Courses
Funded Qualifications
Contact Us
Locations
Enquiry Form
Log In
yes
IQA Form – Site Management
IQA Form – Site Managers
Type of IQA
Formative
Summative
Date of IQA
Candidate First Name
Candidate Last Name
Start Date
End Date
Candidate 2 First Name
Candidate 2 Last Name
Candidate 2 – Start Date
End Date
Candidate 3 First Name
Candidate 3 Last Name
Candidate 3 – Start Date
End Date
Assessor First Name
Assessor Last Name
IQA First Name
IQA Last Name
Qualification Details
Qualification
Mandatory Units
F3H0 04 – Develop and Maintain Good Working Relationships J60D 04 – Allocate Work and Monitor People's Performance J602 04 – Contribute to the Identification of a Work Team J60E 04 – Establish, Implement and Maintain Organisational Systems for Managing Health, Safety, Welfare and Wellbeing J60F 04 – Establish, Control and Monitor Environmental Factors and Sustainability J60G 04 – Evaluate and Confirm Work Methods J60H 04 – Plan the Preparation of the Site for the Project J60J 04 – Monitor Project Activities J60K 04 – Ensure That Work Activities and Resources Meet Project Work Requirements J60L 04 – Organise, Control and Monitor Supplies of Materials J60M 04 – Identify and Maintain Communication Systems and Organisational Procedures J60N 04 – Control Project Progress Against Agreed Quality Standards J60P 04 – Control Project Progress Against Agreed Programmes J60R 04 – Manage Your Personal Development J60S – Identify, Allocate and Plan the Deployment and Use of Plant, Equipment or Machinery J60T 04 – Establish Dimensional Control Criteria J60V 04 – Control Project Quantities and Costs J60W 04 – Evaluate Feedback and Make Recommendations J60X 04 – Manage the Installation, Maintenance, Monitoring and Removal of Temporary Works J601 04 – Enable Learning Opportunities
Paperwork Checklist
Please select all paperwork checked by this IQA
Registration
Evidence
Activities
Reflective Account
Observation Report
Professional Discussion
Candidate Feedback
Registration Form Checks
Yes
No
Does the candidate picture match with the supplied ID?
Is the form Signed?
Does the signature on the ID closely match the signature on the form?
Was English ability confirmed by the assessor/inductor?
Can you confirm No reasonable adjustment requirements were identified?
Evidence – is all the below evidence present and VASCR?
Yes
No
Pre Start Meeting
Health and Safety Meeting
Letter to public or roads department
Schedule of works
Work Permit (permit to dig/hot works etc)
Inspection reports
Health and Safety plan
Risk assessment for a specific activity
Amended Risk Assessment
Young Person’s risk assessment
Records of PPE
Tool Box talks
Site Drawings
Pre-tender agreement of work
Information request sheets
Method statements
Site diary
Progress sheet
Site Layout
Procedures/policy
Quality Policy
Environmental Policy
Contractors remedial sheets
Site inspection sheets
Material testing
Request for materials
Site programme of works
Site instructions
Personnel training plan
Training Matrix
Certification for at least 2 team members
Organisational plan
Company Appraisal
NVQ level 6/ CIOB routes to membership (reflective account)
Site meeting
Works action plan
Resource list request
Records of waste management
Material storage information
Site Survey Reports
Traffic Management plan
Site security showing signage
Material received information
Site induction
Work setting out plan
List of equipment on site
Plant return sheets
CPCS + CSCS Card
Correspondence with suppliers
Delivery notification
Letter to outside parties
Site boundaries and roads information
Non-conformance sheets
Work Variation order
Bill of Quantities
Marked up Drawings
Record of dealing with differences on site
Site Health and Safety (Photographs)
Waste skips with signage identifying content/recycling
COSHH Storage
Maintenance of signage
Training Course research
Pre-use checks
Loler Certs for plant on site
Calibration certs for dimensional control equipment
Handover
Email with Meeting Agenda
Meeting Calendar Invite
Meeting Purpose Email
Meeting Minutes with Allocated Tasks
Activities
Approved
Rejected
Activity 1
Activity 2
Activity 3
Activity 4
Activity 5
Activity 6
SWOT Analysis
Reflective Account
Approved
Rejected
Dimensional Control
Plant, Equipment and Machinery
Observation Report
Yes
No
Is the candidate and course clearly identified?
Has the location of the observation been identified?
Did the assessor cover all the required areas?
Is Picture evidence included?
Are descriptions with the pictures?
Has the Assessor signed the report?
Professional Discussion
Yes
No
Is the assessor clearly identified?
Is the candidate clearly identified?
Is qualification clearly identified?
Is the date clearly identified?
Are all questions and any rework marked and satisfactory?
Has the candidate signed?
Has the assessor signed?
Candidate Feedback
Yes
No
Is the feedback positive?
Overall Feedback
Actions
Development Points
Are certification claims valid?
Yes
No
IQA Signature
Sign Here
Save & Resume
Submit Form